White River North Water Treatment Plant

Indianapolis, Indiana

Industrial Electric was responsible for providing all labor, equipment, and materials for the electrical portion of the new UV radiation system. Our company’s scope included installation of manholes, and all civil work for new pole lights and diesel generator. The UV building work included installation of 1200A switchgear, automatic transfer switching, UPS backup system, PLC automation system, variable frequency drives, and temperature control system.

Click on thumbnail image for larger view