Public / Other

The Childrens Museum of Indianapolis

Industrial Electric was the electrical contractor for the renovation of a 10,000 square foot area on the third floor of the Children’s Museum that would become known as Playscape.
Read more.


Cayuga

Industrial Electric’s work consisted of instrumentation, grounding and heat tracing for a new demineralized water storage tank. An outdoor heated enclosure was provided to house the relocated level transmitter.
Read more.


IAA

Content coming soon!
Read more.