Meridian Foods

Eaton, Indiana

During Meridian Foods facility renovations, Industrial Electric actively participated in the design / build process providing value engineering to our customer. Our scope of work included installation of new conduit and cable in a majority of the facilities production area due to corrosion and upgrades to the plant lighting to LED type fixtures. Replacement of the existing electrical service and additions to the electrical distribution system were also necessary. Our operations team provided extensive coordination services with all trades during the installation of the roofing system.

Upon completion of the building renovations, Meridian Foods added to their wastewater lagoon system. Industrial Electric installed associated electrical systems which included a new 400 amp service, VFDs and control equipment needed for the operation of the new lagoon aeration pump system.

Click on thumbnail image for larger view